Nuclear Regulatory Authority

Transaction and Service Fees

-

NUCLEAR REGULATORY AUTHORITY

LIST OF TRANSACTION AND SERVICE FEES FOR THE YEAR 2022

(Unofficial translation, incase of ambiguity please refer Turkish verion )

-

-

A

LICENSING, PERMIT, APPROVAL AND INSPECTION SERVICES RELATED TO RADIATION SOURCES/PRACTICES/ACTIVITIES/FACILITIES

B

CONFORMITY ASSESSMENT SERVICES

C

LICENSE, PERMIT, APPROVAL AND INSPECTION SERVICES RELATED TO NUCLEAR FACILITIES AND NUCLEAR MATERIALS

TRANSACTIONS and SERVICES

A

LICENSING, PERMIT, APPROVAL AND INSPECTION SERVICES RELATED TO RADIATION SOURCES/PRACTICES/ACTIVITIES/FACILITIES

2022 YILI İŞLEM VE HİZMET BEDELLERİ

A-1

LICENSING

A-1.01

Licensing of medical radiology, dental radiology, veterinary radiology, production, maintenance and repair of radiation sources or to replace radioactive sources, stationary devices for process control and measurement practices, irradiation devices, analysis, measurement, detection devices containing low-activity radioactive source and X-ray analyzers, low-activity radioactive sources, radioimmune testing, vehicle/container scanning devices, package/luggage control devices, leak/explosive substance detection detectors, electron beam welding machines, industrial cabinet radioscopy practices, activities of importation, exportation or transportation of radiation sources

5.285,00

TL/Device or Activity

A-1.02

Licensing of practices with radiotherapy, industrial radiography, industrial radiography practices in the shielded field, well-loging measuring system, mobile/portable nuclear measuring devices 6.445,00

TL/Device or Activity

-

A-1.03

Licensing of irradiation, accelerator, proton therapy, standard calibration, radioactive source preparation, facilities specially designed for the production, maintenance and repair of radiation sources and nuclear medicine practices

26.882,00

TL/Facility or Unit

A-1.04

License renewal of medical radiology, dental radiology, veterinary radiology, production, maintenance and repair of radiation sources or to replace radioactive sources, stationary devices for process control and measurement practices, irradiation devices, analysis, measurement, detection devices containing low-activity radioactive source and X-ray analyzers, low-activity radioactive sources, radioimmune testing, vehicle/container scanning devices, package/luggage control devices, leak/explosive substance detection detectors, electron beam welding machines, industrial cabinet radioscopy practices, activities of importation, exportation or transportation of radiation sources

2.642,00

TL/Device or Activity

A-1.05

License renewal of practices with radiotherapy, industrial radiography, industrial radiography practices in the shielded field, well-loging measuring system, mobile/portable nuclear measuring devices 3.222,00

TL/Device or Activity

-

A-1.06

License renewal of irradiation, accelerator, proton therapy, standard calibration, radioactive source preparation, facilities specially designed for the production, maintenance and repair of radiation sources and nuclear medicine practices

13.441,00

TL/Facility or Unit

A-1.07

Changes to be made on license documents and reissuance of lost documents

1.322,00

TL

A-1.08

Change of license scope of licensed irradiation, accelerator, proton therapy, standard calibration, radioactive source preparation, facilities specially designed for the production, maintenance and repair of radiation sources and nuclear medicine practices

6.720,00

TL

A-2

PERMIT

A-2.01

Commissioning permit of irradiation (gamma irradiation), accelerator, radioactive source preparation (radiopharmaceutical preparation, radioisotope generator production/preparation) proton therapy and standard calibration facilities"

11.828,00

TL

A-2.02

Decommissioning permit of irradiation, accelerator, radioactive source preparation, proton therapy and standard calibration facilities

13.529,00

TL

A-2.03

Permit for import, export, transport, transit passage or temporary import/export of radiation sources

1.469,00

TL

A-3

APPROVAL

A-3.01

Site approval for irradiation facilities (facilities where the radioactive source is stored in the pool)

18.794,00

TL

A-3.02

Spatial design approval of practices with radiotherapy, industrial radiography practices in the shielded field, production, maintenance and repair of radiation sources or to replace radioactive sources and other optional radiation practices

3.133,00

TL/Room

A-3.03

Spatial design approval of irradiation, accelerator, proton therapy, standard calibration, radioactive source preparation, facilities specially designed for the production, maintenance and repair of radiation sources and nuclear medicine practices

18.794,00

TL

A-3.04

Revised spatial design approval of irradiation, accelerator, proton therapy, standard calibration, radioactive source preparation, facilities specially designed for the production, maintenance and repair of radiation sources and nuclear medicine practices

9.398,00

TL

A-3.05

Clearance and release approval of accelerator and radioactive source preparation facilities and nuclear medicine practices

1.566,00

TL

A-4

SITE SURVEY AND INSPECTION

A-4.01

Repeating site survey related to authorization of radiation facilities and radiation applications (for each site survey)

2.938,00

TL

A-4.02

Conducting site survey, assessment and inspection in terms of radiation safety on the basis of request of authorized entity

6.448,00

TL

B

CONFORMITY ASSESSMENT SERVICES

B-1

CONFORMITY ASSESSMENT OF RADIATION MEASUREMENT SYSTEMS (for INTERNATIONAL SURVEILLANCE COMPANIES, METAL SCRAP PROCESSING/HANDLING FACILITIES)

B-1.01

Issuance of Certificate of Conformity

6.745,00

TL

B-2

CONFORMITY ASSESSMENT OF DOSIMETRY SERVICES

B-2.01

Issuance of Certificate of Conformity

24.718,00

TL

B-2.02

Annual Service Fee for Database Usage Up to Three Thousand (including) Persons

98.529,00

TL

B-2.03

Annual Service Fee for Database Usage Over Three Thousand Persons

147.772,00

TL

B-3

AUTHORIZATION OF ENVIRONMENTAL REMEDIATION ACTIVITIES OF AREAS EXPOSED TO RADIOACTIVE CONTAMINATION

B-3.01

Authorization of Environmental Remediation Activities

133.592,00

TL

B-3.02

Inspections*

2.319,00

TL/PersonDay

B-3.03

Release of Site from Regulatory Control

111.326,00

TL

*

Inspection fee is paid to the Regulatory Body by the Authorized Entity in accordance with the work plan submitted by the Authorized Entity to the Regulatory Body, starting from authorization of environmental remediation activıties to release of site from regulatory control, calculated as number of persons per day (PersonDay) announced in December each year. Payment is made in advance in January of each year. Within the year the authorization is issued, the inspection fee notified with the authorization is paid within 30 days. In case of a change in the work plan, the inspection fee is subject to redetermination.

C

LICENSE, PERMIT, APPROVAL AND INSPECTION SERVICES RELATED TO NUCLEAR FACILITIES AND NUCLEAR MATERIALS

C-1

PERMITS, LICENSES AND INSPECTIONS OF NUCLEAR FACILITIES

C-1.01

Permit and Licenses for Nuclear Power Plants * (for each permit or license)

C-1.01.01

Reconginition of Owner

521.969,00

TL

C-1.01.02

Site License

19.947.848,00

TL

C-1.01.03

Construction License

267.530.245,00

TL

C-1.01.04

Commissioning Permit

88.899.846,00

TL

C-1.01.05

Fuel Loading and Trial Operations Permit

25.922.188,00

TL

C-1.01.06

Full Power Operating Permit and Operating License

22.224.895,00

TL

C-1.01.07

Permit for Bringing Fuel (and Heavy Water) to the Site

5.145.432,00

TL

C-1.01.08

Heavy Water Loading Permit

4.809.954,00

TL

C-1.01.09

Permit for Re-starting Operation

11.091.676,00

TL

C-1.01.10

Permit for Modifications **

3.211,00

TL/PersonHour

C-1.01.11

Permit for Start of Procurement

382.198,00

TL

C-1.01.12

Limited Work Permit

28.497.714,00

TL

C-1.02

Permit and Licenses for Research Reactors*

C-1.02.01

Reconginition of Owner

25.734,00

TL

C-1.02.02

Site License

141.687,00

TL

C-1.02.03

Construction License

857.541,00

TL

C-1.02.04

Commissioning Permit

115.561,00

TL

C-1.02.05

Fuel Loading and Trial Operations Permit

115.561,00

TL

C-1.02.06

Full Power Operating Permit and Operating License

227.443,00

TL

C-1.02.07

Permit for Bringing Fuel (and Heavy Water) to the Site

55.933,00

TL

C-1.02.08

Heavy Water Loading Permit

55.933,00

TL

C-1.02.09

Permit for Re-starting Operation

85.754,00

TL

C-1.02.10

Permit for Modifications **

1.133,00

TL/PersonHour

C-1.02.11

Permit for Start of Procurement

44.750,00

TL

C-1.02.12

Limited Work Permit

287.111,00

TL

C-1.03

Permit and Licenses for Mining, Milling, Refining and Storage Facilities *

C-1.03.01

Reconginition of Owner

25.734,00

TL

C-1.03.02

Site License

141.687,00

TL

C-1.03.03

Construction License

857.541,00

TL

C-1.03.04

Trial Operations Permit

33.988,00

TL

C-1.03.05

Full Capacity Operating Permit and Operating License

227.443,00

TL

C-1.03.06

Permit for Re-starting Operation

85.754,00

TL

C-1.03.07

Permit for Modifications **

1.133,00

TL/PersonHour

C-1.03.08

Permit for Start of Procurement

44.750,00

TL

C-1.03.09

Limited Work Permit

84.972,00

TL

C-1.04

Permits and Licenses for Radioactive Waste Disposal Facilities ***

C-1.04.01

Recognition of Owner

25.734,00

TL

C-1.04.02

Site License

141.687,00

TL

C-1.04.03

Construction License

955.463,00

TL

C-1.04.04

Trial Operations Permit

37.873,00

TL

C-1.04.05

Full capacity operating Permit and Operating License

253.406,00

TL

C-1.04.06

Permit for Modifications **

1.254,00

TL/PersonHour

C-1.04.07

Permit for Start of Procurement

49.863,00

TL

C-1.04.08

Limited work permit

94.683,00

TL

C-1.05

Nuclear Facility Inspection Services ****

C-1.05.01

Nuclear Power Plant Inspection Services (for each unit)

65.819.569,00

TL/Year

C-1.05.02

Ore Mining, Grinding, Purification and Storage Facilities Inspection Services (for each facility)

108.596,00

TL/Year

*

- The following process is applied for the payment of service fees in all of the permit or license services given to nuclear facilities. Exceptions are defined in the relevant permits or licenses.

-In nuclear facilities, 1% of the permit or license service fee is deposited into the Authority's account at the time of application. If this fee is not paid, the application will not be reviewed.

-As a result of the review of the application, 79% of the service fee is deposited into the account of the Authority, within one month at the latest, following the notification that it has been accepted by the Authority and that detailed evaluation will begin. If the fee is not paid within the time limit, the review will be suspended until the payment is made.

-In case it is notified that a permit or license will be granted as a result of the review by the Authority, 20% of the service fee is deposited into the Authority's account. If this fee is not paid, no permit or license will be granted.

For applications that do not result in a positive result for any reason, the service fee collected until that day is not refunded, and the same service fees are charged for re-applications.


-

-

**

The service fee for the permit for modifications in nuclear facilities is calculated over the labor force spent and is collected as the document fee after the evaluation process is completed.

***

Excluding deep geological waste disposal facilities

****

During installation and operation of nuclear facility, an annual inspection fee is to be paid after granted limited work permit to facility until removing from regulatory control. The payment is made in advance in January of each year. For the year in which the permit is granted, the fee calculated by proportioning the remaining days of the relevant year, taking into account the day that the permit is granted, is paid within 30 days.

C-2

NUCLEAR FACILITY OPERATING PERSONNE LICENSES *

C-2.01

Nuclear Power Plant Operating Personnel Licenses (chief operator, operators)

6.312,00

TL

C-2.02

Research Reactor Operating Personnel Licenses (chief operator, operators)

886,00

TL

*

In case of extension or license renewal in operating personnel licenses, 50% of the license price is paid. In case of changes to be made on the operating personnel licenses or reissuance of the lost certificate, 20% of the license price is paid.

C-3

IMPORT-EXPORT PERMITS OF NUCLEAR MATERIALS, ITEMS AND STRATEGIC MATERIALS

C-3.01

Import-Export Permits and Conformity Letters for Nuclear Materials, Items and Other Strategic Materials

1.469,00

TL

C-4

MANUFACTURER APPROVALS

C-4.01

Manufacturer Approval Services

C-4.01.01

Manufacturer Approval Services (Manufacturing facilities within the borders of the Republic of Türkiye)

312.057,00

TL

C-4.01.02

Manufacturer Approval Services (Manufacturing facilities outside the borders of the Republic of Türkiye)

42.267,00

$

C-04.02

Manufacturer Approval Period Renewal Services

C-4.02.01

Manufacturer Approval Period Renewal Services (Manufacturing facilities within the borders of the Republic of Türkiye)

94.652,00

TL

C-4.02.02

Manufacturer Approval Period Renewal Services (Manufacturing facilities outside the borders of the Republic of Türkiye)

16.667,00

$

C-4.03

Expansion Services of Manufacturer Approval Scope

C-4.03.01

Extpansion Services of Manufacturer Approval Scope (Manufacturing facilities within the borders of the Republic of Türkiye)

156.024,00

TL

C-4.03.02

Expansion Sevices of Manufacturer Approval Scope (Manufacturing facilities outside the borders of the Republic of Türkiye)

21.134,00

$

C-4.04

Manufacturer Follow-up, Control and Periodic Inspection Services

C-4.04.01

Manufacturer Follow-up, Control and Periodic Inspection Services (Manufacturing facilities within the borders of the Republic of Türkiye)

30.924,00

TL/Inspection

C-4.04.02

Manufacturer Follow-up, Control and Periodic Inspection Services (Manufacturing facilities outside the borders of the Republic of Türkiye)

13.290,00

$/Inspection

C-5

CONSTRUCTION INSPECTION

C-5.01

Authorization Certificate for Inspection of Structures, Systems and Components Important for Nuclear Safety (Domestic Company)

312.057,00

TL

C-5.02

Authorization Certificate for Inspection of Structures, Systems and Components Important for Nuclear Safety (Foreign Company)

42.267,00

$

C-5.03

Authorization Certificate for Inspection of Structures, Systems and Components Not Important for Nuclear Safety (Domestic Company)

56.068,00

TL

C-5.04

Authorization Certificate for Inspection of Structures, Systems and Components Not Important for Nuclear Safety (Foreign Company)

13.290,00

$

C-5.05

Nuclear Construction Inspection Organization Follow-up, Control and Periodic Inspection Services

C-5.05.01

Nuclear Construction Inspection Organization Follow-up, Control and Periodic Inspection Services (Domestic Company)

30.924,00

TL/Inspection

C-5.05.02

Nuclear Construction Inspection Organization Follow-up, Control and Periodic Inspection Services (Foreign Company)

13.290,00

$/Inspection

C-5.06

Nuclear Construction Inspection Organization Renewal Service of Authorization Certificate

C-5.06.01

Renewal of the Certificate of Authorization for the Inspection of Structures, Systems and Components Important for Nuclear Safety (Domestic Company)

93.615,00

TL

C-5.06.02

Renewal of the Certificate of Authorization for the Inspection of Structures, Systems and Components Important for Nuclear Safety (Foreign Company)

12.679,00

$

C-5.06.03

Renewal of the Certificate of Authorization for the Inspection of Structures, Systems and Components Not Important for Nuclear Safety (Domestic Company)

8.411,00

TL

C-5.06.04

Renewal of the Certificate of Authorization for the Inspection of Structures, Systems and Components Not Important for Nuclear Safety (Foreign Company)

3.987,00

$

C-5.07

Expansion the Scope of the Authorization Certificate for Nuclear Construction Inspection Organization *

C-5.07.01

Expansion the Scope of the Authorization Certificate for the Inspection of Structures, Systems and Components Important for Nuclear Safety (Domestic Company)

124.539,00

TL

C-5.07.02

Expansion the Scope of the Authorization Certificate for the Inspection of Structures, Systems and Components Important for Nuclear Safety (Foreign Company)

25.971,00

$

C-5.07.03

Expansion the Scope of the Authorization Certificate for the Inspection of Structures, Systems and Components Not Important for Nuclear Safety (Domestic Company)

37.789,00

TL

C-5.07.04

Expansion the Scope of the Authorization Certificate for the Inspection of Structures, Systems and Components Not Important for Nuclear Safety (Foreign Company)

17.277,00

$

*

If the assessment requires an on-site examination/inspection, an additional inspection service fee is to be paid.

"- The List of Transaction and Service Fees is valid as of 01/01/2022.

-

-

-

-Money Order/EFT charges are not included in the fees.

-

-

-Payments will be made online with accrual number obtained from the Authority.

-

-

18%VAT is included in Transaction and Services Fees."

-